辐射防护 ›› 2022, Vol. 42 ›› Issue (3): 214-221.

• 辐射防护监测 • 上一篇    下一篇

海阳核电厂竣工环保验收实践经验的探讨

韩涛1, 王方1, 左伟伟2, 黄彦君2   

  1. 1.山东核电有限公司,山东 海阳 265116;
    2.苏州热工研究院有限公司,江苏 苏州 215004
  • 收稿日期:2021-07-22 发布日期:2022-07-01
  • 通讯作者: 黄彦君。E-mail: hyj1231@163.com
  • 作者简介:韩涛(1983—),男,2011年毕业于山东大学化学工艺专业,获硕士学位,工程师。E-mail:hantao@spic.com.cn

Experience on environmental protection acceptance monitoring and evaluation from Haiyang NPP

HAN Tao1, WANG Fang1, ZUO Weiwei2, HUANG Yanjun2   

  1. 1. Shandong Nuclear Power Co. Ltd., Shandong Haiyang 265116;
    2. Suzhou Nuclear Power Research Institute, Co. Ltd., Jiangsu Suzhou 215004
  • Received:2021-07-22 Published:2022-07-01

摘要: 根据相关法规标准要求,针对海阳核电厂AP1000机组设计特点,提出竣工环保验收监测方案,根据竣工环保验收监测结果进行了分析评价,得出验收通过的结论。总结了海阳核电厂竣工环保验收监测与评价的经验,分析了竣工环保验收过程中需要重点关注的问题及验收方法,包括验收依据文件的考虑、三废处理性能验证、流出物排放监测验收、非放废水排放监测验收、生态竣工环保验收等,研究了相关技术指南的适用性,提出核电厂竣工环保验收技术规范标准化建议。

关键词: 核电厂, AP1000, 竣工环保验收, 监测与评价

Abstract: According to the requirements of relevant regulations and standards in China, an environmental protection acceptance monitoring plan for NPP completion was proposed in view of the design characteristics of AP1000 at Haiyang Nuclear Power Plant. The environmental protection acceptance monitoring results were presented and evaluated, from which the conclusion of acceptance was made. Moreover, the experience on environmental protection acceptance monitoring and evaluation for nuclear power plant (NPP) was summarized in the aspect of the consideration of the basis document for the acceptance. The performance verification of the management system for waste liquid, waste gas and waste solid, the acceptance monitoring and the evaluation of the effluent discharge and the non-radioactive wastewater, the completion acceptance for the ecological issues, etc., and the applicability of the relevant technical guidelines for the NPP completion environmental protection were analyzed. It was shown that the standardization of environmental protection acceptance monitoring for nuclear power plant completion should be put forward.

Key words: nuclear power plant, AP1000, completion of environmental protection acceptance, monitoring and evaluation