应急撤离模拟在核电厂道路方案优化中的应用

董力1, 王梦溪2, 刘新建3, 刘森林1   

  1. 1.中国原子能科学研究院,北京 102413;
    2.中国核电工程有限公司,北京 100840;
    3.国家核应急响应技术支持中心,北京 100071
  • 收稿日期:2021-10-08 出版日期:2022-03-20 发布日期:2022-04-29
  • 作者简介:董力(1982—),男,现为中国原子能科学研究院辐射防护与环境保护专业博士研究生。E-mail:dongli_ciae@sina.com

Application of emergency evacuation simulation in the optimization of road evacuation scheme for nuclear power plant

DONG Li1, WANG Mengxi2, LIU Xinjian3, LIU Senlin1   

  1. 1. China Institute of Atomic Energy, Beijing 102413;
    2. China Nuclear Power Engineering Co. Ltd., Beijing 100840;
    3. National Nuclear Emergency Response Technical Assistance Center, Beijing 100071
  • Received:2021-10-08 Online:2022-03-20 Published:2022-04-29

摘要: 将概率风险评价方法应用于核电厂的应急撤离模拟,利用自主编写的简化撤离模拟程序,结合厂址事故源项、人口、道路、气象条件等特征,对多个核电厂应急撤离条件下公众与工作人员可能的受照剂量和风险进行了对比分析。在此基础上,结合霞浦厂址应急道路方案遇到的实际问题,在保证事故应急状态下公众和工作人员能够有效撤离的同时,对应急道路方案进行了比选,为工程的实施提供借鉴和参考。相关程序和方法也可为后续发展海岛核电、小型供热堆等提供技术支持,有助于更直观地开展核电公众沟通。

关键词: 应急撤离, 概率风险评价, 应急可行性分析

Abstract: The emergency road of nuclear power plant has always been the focus of the site emergency evacuation feasibility analysis. The probabilistic risk assessment method is applied to the emergency evacuation simulation of nuclear power plants in this paper. Using self-designed simplified evacuation simulation program, combined with the site characteristics of accident source term, population, road and meteorological conditions, the possible exposure doses to the public and staff under emergency conditions of multiple nuclear power plant sites are calculated, and the risks of each site are compared. Besides, combined with the practical problems encountered in the emergency evacuation road scheme of Xiapu site, while ensuring the effective evacuation of the public and staff under emergency conditions, the schemes of emergency evacuation road are compared and selected in combination with the actual situation of the plant site, which could provide reference for the implementation of the Xiapu project. The program and the method mentioned above can also provide technical support for the subsequent development of island nuclear power plant and small heating reactor, which is also conducive to more intuitive public communication of nuclear power.

Key words: emergency evacuation, probabilistic risk assessment, emergency feasibility analysis