RADIATION PROTECTION BULLETIN ›› 2017, Vol. 37 ›› Issue (6): 11-16.

Previous Articles     Next Articles

A Preliminary Analysis of Emergency Preparedness for Xudabu Nuclear Power Plant

Zhang Qianru, Yao Peilin   

  1. CNNC Liaoning Nuclear Power Co. Ltd., Xingcheng, Liaoning, 125100
  • Received:2017-11-15 Online:2017-12-20 Published:2021-11-30

Abstract: The emergency preparedness for the construction stage of Xudabu NPP is discussed, including the calculation of emergency planning zone, the construction of emergency control center, the preparationof emergency plan and the establishment of emergency organization. It focuses on the emergency work planning before the first loading, and the basic ideas forcarrying out the work.

Key words: Nuclear power plant, Emergency preparedness, Planning and development

CLC Number: 

  • TM623.8