Difficulties in Setting up RCA of Fuqing NPP Unit 1 and Optimized Measures

Guo Hang, Hu Ling, Li Gang, Yang Wei, Du Rui, Chen Jing   

  1. Fujian Fuqing Nuclear Power CO. LTD., Fuqing, Fujian, 350318
  • Received:2016-09-17 Online:2016-12-20 Published:2021-11-19

Abstract: As one of the essential conditions ofunit loading, setting up radiation control area (RCA) is an important task for NPP radiation department, from commissioning preparation to reception and operation. The basic requirements are outlined, emphatically on renovation and operation of RCV gateway, acceptance of RCA boundary gates, establishment of RCA entityisolation, setting up and management of clean control area, at Fuqing NPP unit 1. The related engineering construction work in the respect is introduced. The difficulties and optimized measures are analyzed and summarized pertinently.

Key words: NPP, Radiation control area, Engineering construction