Assessment of deposit source term of activated corrosionproducts for HPR1000 nuclear power plants
ZHANG Liying1, LI Xiaojing1, ZENG Jinzhong2, JIN Weiyang3, MAO Yawei1, MI Aijun1
1. China Nuclear Power Engineering Co., Ltd. Beijing 100840; 2. China Nuclear Power Operation and Management Co., Ltd., Zhejiang Haiyan 314300; 3. Fuqing Nuclear Power Co., Ltd., Fujian Fuqing 350300
ZHANG Liying, LI Xiaojing, ZENG Jinzhong, JIN Weiyang, MAO Yawei, MI Aijun. Assessment of deposit source term of activated corrosionproducts for HPR1000 nuclear power plants[J].RADIATION PROTECTION, 2019, 39(3): 192-197.
[1] 福建福清核电有限公司.福建福清核电厂5、6号机组最终安全分析报告[R]. 福建福清核电有限公司,2018. [2] 方岚,徐春艳,刘新华,等. 压水堆核电站一回路活化腐蚀产物源项控制措施探讨[J].辐射防护,2012,32(1):8-14. FANG Lan, XU Chunyan, LIU Xinhua, et al. Source term control measures for activation/corrosion products in PWR primary system[J]. Radiation Protection, 2012,32(1):8-14. [3] EPRI. Plant specific recommendations for PWR radiation source term reduction[R]. Palo Alto, CA: 2009.1019225. [4] Dacquait F, Guinard L, Andrieu C. Status of primary system contamination in French PWRs[R]. Proceedings of the International Conference on Water Chemistry in nuclear reactors systems. 11-14/10/04, San Francisco(USA), Session2, paper4. [5] 许明霞. 压水堆一回路冷却剂活化腐蚀产物钴银锑[J]. 核安全, 2012,11(1):1-8. XU Mingxia. Major activated corrosion products Cobalt, Silver and antimony in the primary coolant of PWR power plants[J]. Nuclear Safety, 2012,11(1):1-8. [6] 福建福清核电有限公司.福建福清核电厂1、2号机组最终安全分析报告[R]. 福建福清核电有限公司,2018.