RADIATION PROTECTION ›› 2022, Vol. 42 ›› Issue (3): 214-221.

Previous Articles     Next Articles

Experience on environmental protection acceptance monitoring and evaluation from Haiyang NPP

HAN Tao1, WANG Fang1, ZUO Weiwei2, HUANG Yanjun2   

  1. 1. Shandong Nuclear Power Co. Ltd., Shandong Haiyang 265116;
    2. Suzhou Nuclear Power Research Institute, Co. Ltd., Jiangsu Suzhou 215004
  • Received:2021-07-22 Published:2022-07-01

Abstract: According to the requirements of relevant regulations and standards in China, an environmental protection acceptance monitoring plan for NPP completion was proposed in view of the design characteristics of AP1000 at Haiyang Nuclear Power Plant. The environmental protection acceptance monitoring results were presented and evaluated, from which the conclusion of acceptance was made. Moreover, the experience on environmental protection acceptance monitoring and evaluation for nuclear power plant (NPP) was summarized in the aspect of the consideration of the basis document for the acceptance. The performance verification of the management system for waste liquid, waste gas and waste solid, the acceptance monitoring and the evaluation of the effluent discharge and the non-radioactive wastewater, the completion acceptance for the ecological issues, etc., and the applicability of the relevant technical guidelines for the NPP completion environmental protection were analyzed. It was shown that the standardization of environmental protection acceptance monitoring for nuclear power plant completion should be put forward.

Key words: nuclear power plant, AP1000, completion of environmental protection acceptance, monitoring and evaluation

CLC Number: 

  • TL75