[1] 陈良,陈莉,李均华.压水堆核电站放射性废液水泥固化技术分析[J].核动力工程,2009,30(02):113-116+123. CHEN liang, CHEN li, LI Junhua. Analysis of cementation technology for liquid radioactive waste in PWR NPPs[J].Nuclear Power Engineering,2009,30(02):113-116+123. [2] 陈敏. 放射性废物水泥固化及其研究进展[C]//中国核学会.中国核科学技术进展报告(第五卷):中国核学会2017年学术年会论文集第6册(核化工分卷、核化学与放射化学分卷、辐射物理分卷).中国核学会,2017. CHEN Min. Progress on cemented solidification of radioactive waste[C]//China Nuclear Society. Progress Report on China's Nuclear Science and Technology(Volume V):Proceedings of the 2017 Academic Conference No.6(Nuclear chemical industry, Nuclear Chemistry and Radiochemistry, Radiation Physics). China Nuclear Society,2017. [3] 郭喜良,杨卫兵,贾梅兰,等.核电站放射性废物混合固化处理可行性研究[J].辐射防护,2016,36(02):72-75+81. GUO Xiliang, YANG Weibin, JIA Meilan, et al. Discussion on mixed solidification of radioactive waste from NPP [J]. Radiation Protecion,2016,36(02):72-75+81. [4] 郭喜良, 徐春艳, 杨卫兵.放射性废物固化/固定处理技术[M].哈尔滨:哈尔滨工程大学出版社,2016:30. GUO Xiliang, XU Chunyan, YANG Weibin. Technique used for solidification/immobilization of radioactive waste [M]. Harbin: Harbin Engineering Universtiy Press, 2016:30. [5] 核与辐射安全中心. 低、中水平放射性废物固化体性能要求——水泥固化体:GB 14569.1—2011[S].北京:中国环境科学出版社, 2011. Nuclear and Radiation Safety Center.Performance requirements for low and intermediate level radioactive waste form——Cemented waste form:GB 14569.1—2011[S]. Beijing:China Environmental Science Press, 2011. [6] 中国建筑材料科学研究总院.通用硅酸盐水泥:GB 175—2007[S]. 北京:中国标准出版社, 2007. China Building Materials Academy. Common portland cement:GB 175—2007[S]. Beijing:China Standard Publishing House, 2007. |