RADIATION PROTECTION BULLETIN ›› 2024, Vol. 44 ›› Issue (5): 22-29.

• Experiences • Previous Articles     Next Articles

Radiation safety supervision and practice during the construction phase of HPR1000

CAO Lei   

  1. CGN Cangnan Nuclear Power Co. Ltd., Zhejiang Wenzhou 325800
  • Received:2024-05-23 Online:2024-10-20 Published:2024-11-25

Abstract: In consideration with radiation safety practice and experience feedback during the construction phase of a HPR1000 nuclear power unit, this paper summarizes the radiation safety management during the engineering construction stage of a nuclear power plant. This paper introduces several innovative practices in radiation safety management during this stage, which could provide good reference for the construction of domestic nuclear power units.

Key words: nuclear power unit, engineering construction, radiation safety supervision, radioactive source, radiation testing