辐射防护通讯 ›› 2017, Vol. 37 ›› Issue (6): 11-16.

• 专题报告 • 上一篇    下一篇

徐大堡核电厂应急工作准备

张倩茹, 姚沛林   

  1. 中核辽宁核电有限公司, 辽宁 兴城, 125100
  • 收稿日期:2017-11-15 出版日期:2017-12-20 发布日期:2021-11-30
  • 作者简介:张倩茹(1993— ),女, 2015年毕业于南华大学辐射防护与环境工程专业,学士; 助理工程师。

A Preliminary Analysis of Emergency Preparedness for Xudabu Nuclear Power Plant

Zhang Qianru, Yao Peilin   

  1. CNNC Liaoning Nuclear Power Co. Ltd., Xingcheng, Liaoning, 125100
  • Received:2017-11-15 Online:2017-12-20 Published:2021-11-30

摘要: 本文就徐大堡核电厂建造至首次装料阶段的应急准备工作进行讨论,主要包括应急计划区测算、应急指挥中心的建设、场内应急计划编写、应急组织建立等内容,重点介绍了首次装料前的应急工作计划和开展工作的基本思路。

关键词: 核电厂, 应急准备, 计划和开展

Abstract: The emergency preparedness for the construction stage of Xudabu NPP is discussed, including the calculation of emergency planning zone, the construction of emergency control center, the preparationof emergency plan and the establishment of emergency organization. It focuses on the emergency work planning before the first loading, and the basic ideas forcarrying out the work.

Key words: Nuclear power plant, Emergency preparedness, Planning and development