[1] NRC. Reactor Safety Study: An Assessment of Accident Risksin U.S. Commercial Nuclear Power Plants[R]. WASH-1400, NUREG-75/014, Washington: NRC, 1975. [2] IAEA. Procedures for Conducting Probabilistic Safety Assessments of Nuclear Power Plants (Level 3)[R]. SSR-050-P-12, Vienna: IAEA, 1996. [3] Kelly G N, Olast M, Sinnaeve J. The CEC Research Program onMethods for Assessing the Radiological Impact of Accidents (MARIA)[J]. Nuclear Technology, 1991,94(2):161. [4] IAEA. The Role of Probabilistic Safety Assessment and Probabilistic Safety Criteria in Nuclear Power Plant Safety[R]. SSR No.106, Vienna:IAEA, 1992. [5] AEC. Theoretical Possibilities and Consequences of Major Accident in Large Nuclear Power PlantsAtomic Energy Commission[R]. ORNL-3441, Washington: AEC, 1957. [6] NRC. Code Manual for MACCS2 User's Guide[Z]. NUREG/CR-6613, Washington: NRC, 1998. [7] NRC. CRAC2 Model Description[R]. NUREG/CR 2313, Washington, NRC, 1984. [8] NRC. MELCOR Accident Consequence Code System (MACCS), Programmer's Reference Manual[R]. NUREG/CR-6613, Washington: NRC, 1990. [9] NRC. Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants[R]. NUREG-1150, Washington: NRC, 1990. [10] 濮继龙. 压水堆核电厂安全与事故对策[M]. 北京:原子能出版社, 1995. [11] NRC. Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities[R]. 60 FR 42622, Washington: NRC, 1995. [12] NRC. Safety Goals for the Operations Nuclear Power Plants; PolicyStatement[R]. 51 FR 30028, Washington: NRC, 1986. [13] NRC. An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis[R]. RG 1.174, Washington: NRC, 2011. [14] OECD/NEA. Probabilistic Accident Consequence Assessment Codes - Second International Comparison, Overview Report[R]. Paris: OECD, 1994. [15] CEC. Probability Accident Consequence Assessment Codes - Second International Comparison[R]. Luxembourg: CEC, 1993. [16] CEC. COSYMA: Users Intercomparison Exercise[R]. Luxembourg: CEC,1993. [17] NRC. Comparison of MACCS Users Calculations for the InternationalComparison Exercise on Probabilistic Accident Consequence Assessment Codes[R].NUREG/CR-6053, Washington: NRC, 1993. [18] NRC. State-of-the-Art Reactor Consequence Analyses (SOARCA) Report[R]. NUREG-1935, Washington: NRC, 2012. [19] NRC. Options For Proceeding With Future Level 3 Probabilistic RiskAssessment Activities[R]. SECY-11-0089, Washington: NRC, 2011. [20] NRC. Regulatory Analysis Guidelines of the U.S. Nuclear RegulatoryCommission[R]. NUREG/BR-0058, Washington: NRC, 2004. [21] NRC. Regulatory Analysis Technical Evaluation Handbook[R]. NUREG/BR-0184, Washington: NRC, 1997. [22] NRC. Feasibility Study for a Risk-Informed and Performance-BasedRegulatory Structure for Future Plant Licensing[R]. NUREG-1860, Washington:NRC, 2007. [23] NRC. Potential Policy, Licensing, and Key Technical Issues for Small Modular Nuclear Reactor Designs[R]. SECY-10-0034, Washington: NRC, 2010. [24] NRC. Use of Risk Insights to Enhance the Safety Focus of Small Modular Reactor Reviews[R]. SECY-11-0024, Washington: NRC, 2011. [25] NRC. Modifying the Risk-Informed Regulatory Guidance for New Reactors[R]. SECY-10-0121, Washington: NRC, 2010. |