[1] |
WANG Mengxi, LIU Xinjian, LIN Hongtao, XUE Na, QIU Lin, ZHAO Bo.
Acceptability analysis of public radiotion risk for HPR1000
[J]. RADIATION PROTECTION, 2024, 44(4): 374-382.
|
[2] |
YU Hong, LIU Ting, CHENG Shisi, LI Lan.
Analysis of transboundary emergency of the 5 MWe graphite reactor in Yongbyon
[J]. RADIATION PROTECTION, 2022, 42(5): 491-494.
|
[3] |
MAO Yawei, MI Aijun, WANG Xiaoliang, LIU Xinjian, CHEN Qiaoyan, QIU Lin, GAO Guiling.
The design of radiation protection optimization for HPR1000
[J]. RADIATION PROTECTION, 2021, 41(1): 1-8.
|
[4] |
YANG Yapeng, FENG Zongyang, JIA Linsheng, WANG Ning, WANG Renze, LIU Yining.
The preliminary development of emergency conditionassessment system for HPR1000
[J]. RADIATION PROTECTION, 2020, 40(6): 647-651.
|
[5] |
JIA Linsheng, WANG Renze, YANG Yapeng, FENG Zongyang, WANG Ning, LIU Yining.
Research and development of core damage assessment system forpressurized water reactor under emergency condition
[J]. RADIATION PROTECTION, 2020, 40(6): 652-656.
|
[6] |
ZHANG Liying, LI Xiaojing, ZENG Jinzhong, JIN Weiyang, MAO Yawei, MI Aijun.
Assessment of deposit source term of activated corrosionproducts for HPR1000 nuclear power plants
[J]. RADIATION PROTECTION, 2019, 39(3): 192-197.
|
[7] |
WEI Guoqiang, LI Lu, ZHENG Wei.
Consideration on constructing mathematic models about releasesource terms from containment building of HPR1000
[J]. RADIATION PROTECTION, 2019, 39(3): 184-191.
|
[8] |
XU Xiaoxiao, ZHANG Jiangang, WANG Renze, YANG Yapeng, FENG Zongyang, JIA Linsheng, WANG Ning.
Analysis of initial events of uranium purification and conversion facility
[J]. RADIATION PROTECTION, 2018, 38(5): 402-407.
|
[9] |
XU Chunsong, BAI Zhiqiang, LI Bing.
Scenario design for nuclear accident emergency exercise based on PSA
[J]. RADIATION PROTECTION, 2018, 38(5): 396-401.
|
[10] |
YANG Ning, TANG Xiuhuan, ZHU Lei.
ORIGEN2-based isotope inventory auto-trackingcode for Xi'an Pulsed Reactor
[J]. RADIATION PROTECTION, 2018, 38(3): 234-239.
|
[11] |
Tang Xiuhuan, Bao Lihong, Wang Baosheng.
Preliminary study on quantitative safety goals of the Xi'an pulsed reactor
[J]. RADIATION PROTECTION, 2017, 37(5): 380-386.
|
[12] |
Su Yongjie, Wang Jianhua, Li Wenhui, Zhong Xia, Sun Zhigang.
Discussions on redefinition methodologies for emergency planning zone of small reactor
[J]. RADIATION PROTECTION, 2017, 37(3): 235-239.
|
[13] |
Wang Yong, Yang Jiayin.
The reforming scheme of heavy water leakage into the secondary coolant detection system of Es-Salam Reactor
[J]. RADIATION PROTECTION, 2016, 36(5): 322-325.
|
[14] |
Zhang Lingyan, Wang Yuhong, Yang Jie, Li Yong, Xiong Min.
Method in defining radioactive airborne effluent emission limit value at nuclear power plant
[J]. RADIATION PROTECTION, 2016, 36(3): 167-172.
|
[15] |
.
[J]. RADIATION PROTECTION, 2015, 35(S1): 118-122.
|