RADIATION PROTECTION ›› 2024, Vol. 44 ›› Issue (S1): 86-89.

Previous Articles     Next Articles

Impact analysis on source term control method for CPR1000 reactor unit temporary outage

SONG Yunlong, ZHAO Yanpeng, WANG Liang   

  1. Liaoning Hongyanhe Nuclear Power LTD, Liaoning Dalian 116300
  • Received:2023-11-23 Online:2024-11-20 Published:2024-12-26

Abstract: The duration of outage, the mode of operation, and the source term control measures will all have an impact on source term. This paper introduces and analyzes the differences in source terms for two CPR1000 units at a nuclear power plant after passive selection of different source term control measures during an outage. This paper also provides recommendations for source term control measures during an outage of a nuclear power unit.

Key words: nuclear power plant, source term control, impact analysis

CLC Number: 

  • TL75+2.2