[1] 李培元,周柏青.发电厂水处理及水质控制[M].北京:中国电力出版社,2012:543-589.
[2] 孔海霞,史英霞,侯建荣,等. 国内核电站放射性水处理系统用水过滤器滤芯现状和探讨[J]. 辐射防护,2015,35(3):163-169.
KONG Haixia,SHI Yingxia,HOU Jianrong,et al. Water filter element used in radioactive water treatment systems of domestic nuclear power plant[J]. Radiation Protection,2015,35(3):163-169.
[3] 乔太飞,孔海霞,史英霞,等. 国内核电厂水过滤器滤芯标准现状与讨论[J]. 辐射防护,2018,38(2):155-159.
QIAO Taifei,KONG Haixia,SHI Yingxia,et al. Status and discussion of standards for water filter elements used in nuclear power plants[J]. Radiation Protection,2018,38(2):155-159.
[4] 任杰,王连生,张雪辉. 秦山三期核电站核级过滤器滤芯升级研究[J]. 景德镇学院学报,2021,36(6):22-25.
REN Jie,WANG Liansheng,ZHANG Xuehui. Research on upgrading the nuclear filter element of qinshan nuclear power plant Ⅲ[J].Journal of Jingdezhen University,2021,36(6):22-25.
[5] 孙汉虹,程平东,缪鸿兴. 第三代核电技术AP1000[M]. 北京:中国电力出版社,2010:319.
[6] 郑明光. 压水堆国家重大专项与CAP1400型号研发[J]. 南方能源建设,2015,2(4):3-7.
[7] 李源,王佳,刘夏诚,等. AP/CAP系列核电机组放射性水处理用水过滤器滤芯的研制[J]. 辐射防护通讯,2022,42(2):14-20.
LI Yuan,WANG Jia,LIU Xiacheng,et al. Development of AP/CAP series nuclear power unit for radioactive water treatment water filter element[J]. Radiation Protection Bulletin,2022,42(2):14-20.
[8] 游祥飞,顾㑳宙,孟雷,等. AP1000核电机组主回路相关水过滤器滤芯更换和转运操作工艺研究及相关设备设计[J]. 辐射防护通讯,2017,37(1):1-7.
YOU Xiangfei,GU Zhouzhou,MENG Lei,et al. Process research and related equipment design for primary loop related water filter cartridge replacement and transport of AP1000 nuclear power unit[J]. Radiation Protection Bulletin,2017,37(1):1-7.
[9] ASME. Rules for construction of pressure vessels: with addenda through 2008 addendum:ASME BPVC-Ⅷ—2007[S]. 2007 Edition.New York:The American Society of Mechanical Engineers,2008.
[10] ASME.焊接和无缝轧制钢管:ASME B36.10M—2015[S]. 中石协ASME规范产品专业委员会(CACI)译. 北京:中国石化出版社,2016.
[11] 张建伟,白海波,李昕. ANSYS 14.0超级学习手册[M]. 北京:人民邮电出版社,2013.
[12] ASME. Rules for construction of nuclear power plant components:ASME BPVC-Ⅷ[S]. 2010 Edition.New York:The American Society of Mechanical Engineers,2010. |