辐射防护通讯 ›› 2015, Vol. 35 ›› Issue (1): 1-5.

• 宁德核电厂第一次大修专题(二) • 上一篇    下一篇

CPR1000压水堆检修中的辐射防护管理

杨岩, 杨小强, 郭飞, 左国勇, 董正鹏, 邓克春   

  1. 宁德核电有限公司, 福建 福鼎, 355200
  • 收稿日期:2014-08-20 出版日期:2015-02-20 发布日期:2025-02-11
  • 作者简介:杨岩(1981- ),男;2006年毕业于淮海工学院电子商务,学士; 辐射防护工程师。

Management of Radiation Protection during Overhaul at CPR1000 PWR

Yang Yan, Yang Xiaoqiang, Guo Fei, Zuo Guoyong, Dong Zhengpeng, Deng Kechun   

  1. Ningde Nuclear Power Co.,Ltd., Fujian Fuding, 355200
  • Received:2014-08-20 Online:2015-02-20 Published:2025-02-11

摘要: CPR1000压水堆实行专业化检修,辐射防护管理面临新的机遇和挑战。本文介绍了宁德核电站N101首次大修的辐射防护管理,并与大亚湾核电站(同类堆型)进行比较,指出不同之处,提出相应的管理改进建议。

关键词: 压水堆, 大修, 辐射防护, CPR1000

Abstract: Specialized overhaul is practiced at CPR1000 PWR, facing new opportunity and challenge in radiation protection management. This paper presents a description of the radiation protection management during first overall of N101 at Ningde Nuclear Power Plant and provides a comparison with Daya Bay NPP which has the similar reactor type, with differences between both being pointed out and relevant improvement suggested.

Key words: PWR, Overhaul, Radiation protection management, CPR1000

中图分类号: 

  • TL75+2.1