1]Yang H, Jiang B, Staroswiecki M. Fault recoverability analysis of switched systems[J]. International Journal of Systems Science, 2012, 43(3): 535542
[2]刘阶萍,罗振璧,陈恳,快速可重组制造系统的可诊断性设计原理[J]. 清华大学学报(自然科学版),2000,40 (9) :1417
Liu J P, Luo Z B, Chen K. The diagnostic design principles of fast reconfigurable manufacturing system[J]. Journal of Tsinghua University : Science and Technology, 2000, 40(9): 1417
[3]罗振璧, 于学军, 刘阶萍. 可重构性和可重构设计理论[J]. 清华大学学报 (自然科学版), 2004, 44(5): 577580
Luo Z B, Yu X J, Liu J P. Reconfigurability and reconfigurable design theory[J]. Journal of Tsinghua University : Science and Technology, 2004, 44(5): 577580
[4]Kuo W, Prasad Rajendra V. Optimal reliability design: fundamentals and applications[M]. Oxford city:Cambridge University Press, 2001
[5]Liang Y C, Smith A E. An ant colony optimization algorithm for the redundancy allocation problem (RAP)[J]. IEEE Transactions on Reliability, 2004, 53(3): 417423
[6]RamirezMarquez J E, Coit D W. A heuristic for solving the redundancy allocation problem for multistate seriesparallel systems[J]. Reliability Engineering & System Safety, 2004, 83(3): 341349
[7]Chern M S. On the computational complexity of reliability redundancy allocation in a series system[J]. Operations Research Letters, 1992, 11(5): 309315
[8]Tvsersky A, Kahneman D. Judgment under uncertainty: heuristics and biases[J]. Science,1974,185(4157):11241131
[9]Sharma J, Venkateswaran K V. A direct method for maximizing the system reliability[J]. IEEE Transactions on Reliability, 1971,R20(20):256259
[10]Nakagawa Y , Nakashima K. A heuristic method for determining optimal reliability allocation[J]. IEEE Transactions on Reliability, 1977, R26(26): 156161
[11]Chen C L, Chen N. Direct search method for solving economic dispatch problem considering transmission capacity constraints[J]. IEEE Transactions on Reliability, 2001, 16(4): 764769 |